
Fanimation
Powerful and Energy Efficient: The FPD3250BL-52NON ceiling fan features a 6-speed, quiet DC motor delivering up to 5,141 CFM airflow, providing optimal cooling for large indoor and covered outdoor spaces. Easy Installation with KWIKWIRE: Quick and secure wiring using two simple connectors instead of wire nuts ensures faster setup. Includes a 6" downrod for flat or slightly sloped ceilings, with optional downrods up to 72" for ideal hanging height. Advanced Remote Control: Comes with a TR360 hand-held DC remote featuring 6 fan speeds, infinite light dimming with 5 CCT selections (light kits not included), fan reversing, Fresh Air mode, Home Away mode, Safe Exit feature, and simple Learn Pairing te
Lower = better sales rank
Please sign in to leave a review
No reviews yet. Be the first to review!